Terms of Reference for 2020/21 Scheduling and Dispatch Process Audits
Affected Period
Status
Closed
Category
Run type
Created
08/04/2021 16:34
Last Updated
08/04/2021 16:39
Note issued on behalf of the Transmission System Operators
In compliance with Paragraph 9 of Condition 10A
and Condition 22A of their respective Transmission System Operator Licences,
EirGrid and SONI are required to undertake a periodic audit of the operation
and implementation of the Scheduling and Dispatch process.
The Transmission System Operators
recently published the Terms
of Reference for the audits of the 2020 and 2021 calendar years.
This publication follows a consultation on the proposed scope. Responses
to the consultation are summarised in the terms of reference document and are
published in full on the EirGrid
and SONI libraries.
EirGrid and SONI would like to thank respondents
for their representations.