TypeNameUploaded Amended CommentsStatus
Portable Document Format (PDF) Independent-Assurance Report on for the 12 month period ended 31 December 2022 30/11/2023 30/11/2023 Please Note: An agreed variation in the scope was made from the published Terms of Reference ("ToR") in consultation with the Regulatory Authorities (Scheduling and Dispatch 2022-23 Terms of Reference). The analysis performed by the auditor for the 2022 audit period concluded that the Cross Zonal Actions (“CZA”) scope was not suitable for inclusion in the Independent Assurance Report on compliance with specified elements of the Scheduling and Dispatch process for the 12-month period ended 31 December 2022.
Portable Document Format (PDF) Week 48 2023 Weekly Operational Constraints Update Rev 1 27/11/2023 27/11/2023
Portable Document Format (PDF) System Margins Outlook IE 27112023 27/11/2023 27/11/2023
Portable Document Format (PDF) System Margins Outlook NI 27112023 27/11/2023 27/11/2023
Portable Document Format (PDF) Wk48 2023 Weekly Operational Constraints Update 24/11/2023 24/11/2023
Portable Document Format (PDF) System Margins Outlook IE 24112023 24/11/2023 24/11/2023
Portable Document Format (PDF) System Margins Outlook NI 24112023 24/11/2023 24/11/2023
Portable Document Format (PDF) System Margins Outlook IE 20112023 20/11/2023 20/11/2023
Portable Document Format (PDF) System Margins Outlook NI 20112023 20/11/2023 20/11/2023
Portable Document Format (PDF) Week 47 2023 Weekly Operational Constraints Update 17/11/2023 17/11/2023