CMC_16_25
|
CRM De-rating factors for DSU
|
New
|
Active
|
Section C, Section D
|
|
|
CMC_15_25
|
Performance Securities for Extended Projects in T-4 2026/2027
|
In Consultation
|
Active
|
Section J
|
|
|
CMC_14_25
|
New Dates in Capacity Auction Timetable
|
In Consultation
|
Active
|
Appendix C, Section C, Section F
|
|
|
CMC_13_25
|
Amendments to Capacity Auction Timetable
|
In Consultation
|
Active
|
Section D
|
|
|
CMC_12_25
|
RAs role in relation to FQDs
|
In Consultation
|
Active
|
Section B, Section E
|
|
|
CMC_11_25
|
Clarification on provisions relating to 'final and binding' and dispute resolution under the CMC
|
In Consultation
|
Active
|
Section B, Section E, Section F
|
|
|
CMC_10_25
|
Amendments to E.7
|
In Consultation
|
Active
|
Section E
|
|
|
CMC_09_25
|
Registration and Qualification Auction Timetable Milestones
|
In Consultation
|
Active
|
Appendix C, Appendix E, Glossary, Agreed Procedure 3
|
|
|
CMC_08_25
|
Ensuring robust transparent and objective qualification criteria in the Capacity Market
|
In Consultation
|
Active
|
Appendix D, Section E
|
|
|
CMC_07_25
|
Maintaining Net Present Value in new capacity market contracts for no fault delays
|
In Consultation
|
Active
|
Glossary, Section J
|
|
|
CMC_06_25
|
Amendment of ARHL De-rating Factor Definition to Exclude Intermediate Length Contracts
|
In Consultation
|
Active
|
Glossary
|
|
|
CMC_05_25
|
Early Termination of Intermediate Length Contract Capacity
|
In Consultation
|
Active
|
Section J
|
|
|
CMC_04_25
|
Adjustment of CMC auction qualification criteria to facilitate complex projects within State Aid Approval
|
In Consultation
|
Active
|
Glossary, Section E
|
|
|
CMC_03_25
|
Clarification of Proportion of Delivered Capacity for multiple tranches
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section G
|
16/07/2025
|
|
CMC_02_25
|
Separate De-rating Factor for New Vs Existing Capacity
|
RA Decision: Recommended for Rejection
|
Closed
|
Appendix D, Section C, Section D, Section E, Section G, Section I
|
|
|
CMC_01_25
|
Provision of Information Related to Application Rejection under E.7
|
In Consultation
|
Active
|
Section E
|
|
|
CMC_12_24
|
Proportion of Delivered Capacity in respect of incremental New Capacity
|
Withdrawn
|
Closed
|
Section G
|
|
|
CMC_11_24
|
Implementation of Early Delivery Incentives according to SEMC Decision Paper SEM-24-037
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Appendix F, Glossary, Section D, Section F
|
17/09/2024
|
|
CMC_10_24
|
Introduction of Intermediate Length Contracts
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section D, Section E, Section F, Section G, Section J, Section M
|
17/09/2024
|
|
CMC_09_24
|
Amendments to J.5.7 and J.5.8
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
27/09/2024
|
|
CMC_08_24
|
Widening of Longstop Extension Process to Awarded Capacity for 2023-24 Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
27/09/2024
|
|
CMC_07_24
|
Treatment of Capacity Contracts of Varying Duration in Constrained Auction Solution
|
RA Decision: Further review required
|
Active
|
Section F
|
|
|
CMC_06_24
|
Performance Securities for Extended Projects
|
RA Decision: Recommended for Rejection
|
Closed
|
Section J
|
|
|
CMC_05_24
|
Amendment to J.6.1.6 to recognise extensions granted under SEM-23-101 and SEM-23-108
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
01/10/2024
|
|
CMC_04_24
|
Recovery of Net Present Value Lost as a Result of No-Fault Delays to New Capacity
|
RA Decision: Recommended for Rejection
|
Closed
|
Glossary, Section J
|
|
|
CMC_03_24
|
Enduring Mechanism for Indexation based on GB Model
|
RA Decision: Recommended for Rejection
|
Closed
|
Section F
|
03/10/2024
|
|
CMC_02_24
|
Modification to the Performance Security Requirement
|
RA Decision: Recommended for Rejection
|
Closed
|
Section J
|
|
|
CMC_01_24
|
Amendment to criteria to achieving Substantial Financial Milestone
|
Withdrawn
|
Closed
|
Section J
|
|
|
CMC_25_23
|
Market Readiness Certification
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section C, Section G, Section J
|
12/01/2024
|
|
CMC_24_23
|
Revision of the Exception Application Timelines
|
RA Decision: Recommended for Rejection
|
Closed
|
Agreed Procedure 3, Glossary, Section J
|
|
|
CMC_23_23
|
Mitigation of Impact on Participants relating to System Operator Grid Connection delays
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section J
|
01/01/2024
|
|
CMC_22_23
|
Indexation of Capacity Payment Price for inflation
|
Recommended For Rejection
|
Closed
|
Appendix F, Glossary, Section F
|
01/10/2024
|
|
CMC_21_23
|
Minimum Completion on Receipt of Interim Operational Notification
|
RA Decision: Recommended for Rejection
|
Closed
|
Section C, Section G, Section J
|
|
|
CMC_20_23
|
Amendment to Timing of Opt Out Notifications
|
RA Decision: Recommended for Rejection
|
Closed
|
Section E
|
|
|
CMC_19_23
|
Modification to implement the SEMC Decision set out in SEM-23-038 and SEM-23-045
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section E, Section F
|
12/12/2023
|
|
CMC_18_23
|
Amendment to Definition of Third Party Extension Period
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary
|
16/02/2024
|
|
CMC_17_23
|
Updates to LCC Areas
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section C, Section D
|
03/10/2023
|
|
CMC_16_23
|
Extension to New Capacity Impacted by Indexation
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section J
|
01/01/2024
|
|
CMC_15_23
|
Amendment to Performance Securities for Extended Projects
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
08/09/2023
|
|
CMC_14_23
|
LCC Violation Criteria
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section F
|
03/10/2023
|
|
CMC_13_23
|
Min Completion Prior to Long Stop Date
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G, Section J
|
20/12/2023
|
|
CMC_12_23
|
Facilitation of Unit Specific Price Caps for Existing Capacity in Excess of the Auction Price Cap
|
RA Decision: Recommended for Rejection
|
Closed
|
Glossary, Section J
|
|
|
CMC_11_23
|
Amendment to Drafting Introduced Under Modification CMC_15_22
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section J
|
22/11/2023
|
|
CMC_10_23
|
Mitigation of Impact on Participants relating to 3rd Party Gas Connection delays
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Glossary, Section J
|
01/01/2024
|
|
CMC_09_23
|
Removal of Section J.6.1.6 (1)
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
01/01/2024
|
|
CMC_08_23
|
Typographical Correction Capacity Aggregation Threshold
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
11/12/2023
|
|
CMC_07_23
|
Special Application of ISTA
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
02/10/2023
|
|
CMC_06_23
|
Second ARHL Modification to Complete SEM-22-044
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E, Section G, Section I
|
11/01/2024
|
|
CMC_05_23
|
Resolving inconsistency in definition of Existing Capacity Arising from CMC_11_22
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
08/02/2024
|
|
CMC_04_23
|
Introduction of Remedial Action for Unforeseeable Delays Due To Extraordinary Supply Chain Impacts
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E, Section J
|
01/01/2024
|
|
CMC_03_23
|
Amendment of Long Stop Date for T-1 Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
30/06/2023
|
|
CMC_02_23
|
Amendment of Milestones Associated with Substantial Financial Completion
|
Withdrawn
|
Closed
|
Section J
|
|
|
CMC_01_23
|
Amendment to Substantial Completion Drafting
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
01/01/2024
|
|
CMC_16_22
|
Secondary Trading Delays to Awarded New Capacity
|
Withdrawn
|
Closed
|
Section E, Section J, Section M
|
|
|
CMC_15_22
|
Introduction of New Remedial Action to enable extensions due to planning and Permitting Delays
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
20/01/2023
|
|
CMC_14_22
|
Modification re-Mitigation of impact of Third-Party delays on Participants and extension of Support term
|
Withdrawn
|
Closed
|
|
|
|
CMC_13_22
|
Judicial Review Remedial Action
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
20/01/2023
|
|
CMC_12_22
|
Remedial Action in the event of planning application to a project that qualifies under a Direction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
20/01/2023
|
|
CMC_11_22
|
De-rating for Annual Run Hours Limits
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section C, Section D, Section E, Section G, Section I
|
05/09/2022
|
|
CMC_10_22
|
Introduction of New Remedial Action in the event of Third Party Delays
|
RA Decision: Recommended for Rejection
|
Closed
|
Section J
|
14/10/2022
|
|
CMC_09_22
|
Secondary Trade Approval Notification
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section M
|
|
|
CMC_08_22
|
Local Capacity Constraints Maximum Quantities
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section C, Section F
|
30/09/2022
|
|
CMC_07_22
|
Joint Market Registration Variation in Mix
|
RA Decision: Recommended for Rejection
|
Closed
|
Section G, Section I
|
30/09/2022
|
|
CMC_06_22
|
New Interdependent Combined Units
|
Withdrawn
|
Closed
|
Section E, Section F
|
|
|
CMC_05_22
|
Housekeeping Mod to Update Overlap between CMC_03_21 and CMC_04_21
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
01/07/2022
|
|
CMC_04_22
|
New Reference Rates for Default Interest
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
30/09/2022
|
|
CMC_03_22
|
Transparency on Publication of Qualification Results
|
RA Decision: Approved (Revised Legal Drafting)
|
Closed
|
Section E
|
08/07/2022
|
|
CMC_02_22
|
Timely Publication of FAIP
|
RA Decision: Approved (Revised Legal Drafting)
|
Closed
|
Section F
|
08/07/2022
|
|
CMC_01_22
|
New Interdependent Combined Units
|
RA Decision: Approved (Revised Legal Drafting)
|
Closed
|
Section E
|
08/07/2022
|
|
CMC_12_21
|
Modification to the methodology for calculating the De-Rated Grid Code Commissioned Capacity
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
19/11/2021
|
|
CMC_11_21
|
Extending Current ASTN Form
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section M
|
|
|
CMC_10_21
|
Modification to the provisions for Market Registration of Demand Side Units
|
Withdrawn
|
Closed
|
Section E, Section G, Section I
|
|
|
CMC_09_21
|
Timeframe to consider SFC Extensions
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
21/09/2021
|
|
CMC_08_21
|
Ex-post Verification of Compliance with the CO2 Limits
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section I
|
02/11/2021
|
|
CMC_07_21
|
E.4 Application for Qualification Update
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E
|
02/11/2021
|
|
CMC_06_21
|
NIRO and DSU
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E, Section I
|
21/09/2021
|
|
CMC_05_21
|
Substitution of Candidate Units
|
RA Decision: Recommended for Rejection
|
Closed
|
Section J
|
|
|
CMC_04_21
|
Verification Requirements for Implementation Plan Milestones
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
14/07/2021
|
|
CMC_03_21
|
Modification to the provisions for Substantial Financial Completion
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section J
|
19/11/2021
|
|
CMC_02_21
|
Amendment to Capacity Market Code Modifications Workshop Agenda Timeline
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
14/07/2021
|
|
CMC_01_21
|
Amendment relating to the provision of the CAM Report following a Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
14/07/2021
|
|
CMC_12_20
|
Fix to Seller Limit in CMC_09_19
|
Withdrawn
|
Closed
|
Section M
|
|
|
CMC_11_20
|
Providing greater flexibility for the current interim Secondary Trading Notification (ISTN) process
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
26/10/2020
|
|
CMC_10_20
|
Change to determinations made in F.4.1.1
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
26/10/2020
|
|
CMC_09_20
|
Modification to the Long Stop Date for the CY2020 / 21 T-1 Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
28/08/2020
|
|
CMC_09_19B
|
Addendum
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
13/11/2020
|
|
CMC_08_20
|
Change Awarded Existing Capacity to Awarded New Capacity
|
RA Decision: Recommended for Rejection
|
Closed
|
Section I
|
|
|
CMC_07_20
|
Change in Technology Class
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section C, Section G, Section J
|
18/01/2021
|
|
CMC_06_20
|
Combining Capacity Units into a Capacity Market Unit – Proposed Changes
|
RA Decision: Recommended for Rejection
|
Closed
|
Section E
|
|
|
CMC_05_20
|
Implement amendments as required by the Clean Energy Package Regulation EU 2019 / 943
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section D, Section E, Section J
|
27/04/2020
|
|
CMC_04_20
|
Providing greater flexibility for New Capacity to combine candidate units into a single Capacity Market Unit
|
RA Decision: Recommended for Rejection
|
Closed
|
Section E
|
|
|
CMC_03_20
|
Modification to the Long Stop Date for the CY2023 / 24 T-4 Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
30/03/2020
|
|
CMC_02_20
|
Modification to the required time frame for a T-4 Capacity Auction to take place
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
12/02/2020
|
|
CMC_01_20
|
Modification to the required time frame for a T-4 Capacity Auction to take place
|
Withdrawn
|
Closed
|
Section D
|
|
|
CMC_09_19
|
Supplementary Interim Secondary Trading
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
13/11/2020
|
|
CMC_08_19
|
Housekeeping Mod E.8.2.5 & E.8.2.8
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E
|
17/02/2020
|
|
CMC_07_19
|
Treatment of Multiyear Contracts in the Event of Simultaneous Capacity Auctions
|
RA Decision: Recommended for Rejection
|
Closed
|
Section E, Section F
|
|
|
CMC_06_19
|
Modification to the Proportion of Delivered Capacity calculation (G.3.1.4)
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
12/09/2019
|
|
CMC_05_19
|
Housekeeping Changes
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F, Section J
|
12/09/2019
|
|
CMC_04_19
|
Finalisation of Exchange Rate in Auction Information Pack
|
RA Decision: Recommended for Rejection
|
Closed
|
Section D
|
|
|
CMC_03_19
|
Treatment of Exempt Price-Quantity Pairs
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Definitions, Section F
|
20/03/2019
|
|
CMC_02_19
|
Negative Interest
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B, Section J
|
20/03/2019
|
|
CMC_01_19
|
Interim Solution for Conducting Capacity Auctions
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section M
|
20/03/2019
|
|
CMC_25_24
|
capacity-market-modifications
|
|
Closed
|
Appendix A, Appendix B, Agreed Procedure 5
|
18/11/2024
|
|
CMC_14_18
|
Proposed Modifications in Regards to the Modification of LCC MW Limits by the RAs
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
30/11/2018
|
|
CMC_13_18
|
Modification to Letter of Credit
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
30/11/2018
|
|
CMC_12_18
|
Tolerance Class
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Definitions, Section D, Section E
|
30/11/2018
|
|
CMC_11_18
|
Long Stop Date
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Definitions, Section D, Section J
|
30/11/2018
|
|
CMC_10_18
|
Paragraph B.10.4.1 Report on Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
01/10/2018
|
|
CMC_09_18
|
Paragraph E.9.5.1 Publication of Qualification Results
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
01/10/2018
|
|
CMC_08_18
|
Typographical Correction – E.8.2.4
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
01/10/2018
|
|
CMC_07_18
|
Subsection F.9.5 Information Published following a Capacity Auction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
01/10/2018
|
|
CMC_06_18
|
Disaggregation of Performance Security Requirements to Capacity Market Auctions
|
RA Decision: Recommended for Rejection
|
Closed
|
Section J
|
|
|
CMC_05_18
|
Combining Candidate Units into a Capacity Market Unit
|
RA Decision: Recommended for Rejection
|
Closed
|
Section F
|
|
|
CMC_04_18
|
F.2.1.1 Capacity Auction Participation
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
01/10/2018
|
|
CMC_03_18
|
E.5.1.1.A
|
Withdrawn
|
Closed
|
Appendix D, Section E, Section J
|
|
|
CMC_02_18
|
Permitted Disclosures Credit Agencies
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
01/10/2018
|
|
CMC_01_18
|
NICROS in the CRM
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E
|
01/10/2018
|
|