Mod_02_25
|
SEMO Housekeeping 2025
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section B, Section E, Section G, Section H, T&SC Glossary
|
14/08/2025
|
|
Mod_01_25
|
Synchronous Condensers SDP_06
|
Recommended for Approval
|
Active
|
Section B, Section D, T&SC Appendix I, T&SC Appendix O, T&SC Glossary
|
|
|
Mod_07_24
|
Introduction to TEG Activation Compensation Payment
|
RA Decision: Recommended for Rejection
|
Closed
|
Section F
|
|
|
Mod_06_24
|
SEMO preparatory actions for ART13.7 CEP
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section H
|
01/10/2024
|
|
Mod_05_24
|
Clarification of Start Up Payment Conditions
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
23/08/2024
|
|
Mod_04_24
|
SEMO Housekeeping 2024
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
23/08/2024
|
|
Mod_03_24
|
Update of Difference Charge Calculation Logic
|
Withdrawn
|
Closed
|
Section F
|
|
|
Mod_02_24
|
SDP_02 Battery Integration V3
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Agreed Procedure 1, Agreed Procedure 4, Section B, Section D, Section F, T&SC Appendix H, T&SC Appendix I, T&SC Appendix O, T&SC Glossary
|
|
|
Mod_01_24
|
Inclusion of Difference Charges in Calculation of Make Whole Payment Revenue
|
Withdrawn
|
Closed
|
Section F
|
|
|
Mod_13_23
|
SDP_01 Treatment of Non-Priority Dispatch Renewables
|
Recommended for Approval
|
Active
|
Section D, Section F, T&SC Appendix E, T&SC Appendix I, T&SC Appendix K, T&SC Appendix O, T&SC Glossary
|
|
|
Mod_12_23
|
Extension to Timing for Execution of Deeds
|
Withdrawn
|
Closed
|
Agreed Procedure 1
|
|
|
Mod_11_23
|
SDP_02 Battery Integration
|
RA Decision: Recommended for Rejection
|
Closed
|
Section B, Section D, Section F, T&SC Appendix I, T&SC Appendix O, T&SC Glossary
|
|
|
Mod_10_23
|
Market Compensation for Firm Curtailment Look Back period
|
Recommended for Approval
|
Active
|
Section H
|
|
|
Mod_09_23
|
Correction to the calculation of SDPIMB
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
21/12/2023
|
|
Mod_08_23
|
Archiving Part A and C of the TSC
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
30/07/2024
|
|
Mod_07_23
|
Collection of Monies M+4 Update
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
28/07/2023
|
|
Mod_06_23
|
SEMO Housekeeping 2023
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 4, Section F, T&SC Glossary
|
28/07/2023
|
|
Mod_05_23
|
Market Compensation for Firm Curtailment
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section F, Section G, T&SC Glossary
|
|
|
Mod_04_23
|
Modification Proposal to implement SEMC Decision SEM-23-029
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F, T&SC Appendix K, T&SC Glossary
|
04/07/2023
|
|
Mod_03_23
|
Modify SEMO timing sending Settlement Query to external Data Provider
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 13
|
22/05/2023
|
|
Mod_02_23
|
DSU Energy Payments
|
Recommended for Approval
|
Active
|
Agreed Procedure 1, Section B, Section F, Section G, Section H
|
|
|
Mod_01_23
|
Remuneration of Commissioning Unit
|
RA Decision: Recommended for Rejection
|
Closed
|
Section D
|
|
|
Mod_18_22
|
Mitigating risks of settlement of units running on secondary fuel in security of supply scenarios
|
Withdrawn
|
Closed
|
|
|
|
Mod_17_22
|
System Action Repricing
|
RA Decision: Approved (Not Vetoed)
|
Active
|
Section E
|
|
|
Mod_16_22
|
SEMO Housekeeping 2022
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section D, Section E, Section F, Section G, T&SC Glossary
|
14/12/2022
|
|
Mod_15_22
|
Timelines for Processing Letters of Credit
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 9
|
20/01/2023
|
|
Mod_14_22
|
Removal of the requirement to post De-registration Consent Orders
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 18
|
28/11/2022
|
|
Mod_13_22
|
Bidirectional Imperfections Charge Factor Modification
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
24/01/2023
|
|
Mod_12_22
|
Extension of System Service Flag to cover Replacement Reserve Resources
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
23/11/2022
|
|
Mod_11_22
|
Permitting the use of email to communicate credit cover changes on Demand Guarantees
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E
|
04/11/2022
|
|
Mod_10_22
|
Strike Price Volatility Modifier
|
Withdrawn
|
Closed
|
Section F
|
|
|
Mod_09_22
|
Exclusion of Difference Charges During Non-Ro Events
|
RA Decision: Recommended for Rejection
|
Closed
|
Section F
|
12/12/2022
|
|
Mod_08_22
|
Weekly Strike Price Calculation
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
17/08/2023
|
|
Mod_07_22
|
Indexation to Calculation of Capacity Payments for New Capacity
|
RA Decision: Recommended for Rejection
|
Closed
|
Section F
|
19/03/2024
|
|
Mod_06_22
|
Housekeeping Alignment Modification
|
Withdrawn
|
Closed
|
Section E
|
|
|
Mod_05_22
|
SEMO Performance Reporting Frequency
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B, T&SC Appendix E
|
02/09/2022
|
|
Mod_04_22
|
Alternatives to LIBOR
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, T&SC Glossary
|
11/03/2022
|
|
Mod_03_22
|
Collection of Monies
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
14/03/2022
|
|
Mod_02_22
|
Cost Recovery when Under Test
|
RA Decision: Recommended for Rejection
|
Closed
|
Section D, Section F
|
12/12/2022
|
|
Mod_01_22
|
Balance Surety_Demand Guarantee
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G, T&SC Appendix A, T&SC Glossary
|
16/05/2022
|
|
Mod_21_21
|
Undo Instruction Scenario 4
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix O
|
04/11/2022
|
|
Mod_20_21
|
Undo Instruction Scenario 2
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix O
|
14/03/2022
|
|
Mod_19_21
|
Modification re Publication of Information by SEMO
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
09/02/2022
|
|
Mod_18_21
|
Temporary derogation from SEMO charges related to Mod_02_21
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section G
|
04/11/2021
|
|
Mod_17_21
|
Second Housekeeping 2021
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F, Section G
|
16/11/2021
|
|
Mod_16_21
|
Temporary use of the Market Backup Price where an Interconnector Trade Quantity and Price are submitted
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section H
|
29/09/2021
|
|
Mod_15_21
|
Alter CDIFF Section F.18.7.2
|
Withdrawn
|
Closed
|
Section F
|
|
|
Mod_14_21
|
Extension of System Service Flag to include units providing Replacement Reserve in line with the detailed design
|
RA Decision: Recommended for Rejection
|
Closed
|
|
12/12/2022
|
|
Mod_13_21
|
Interest Modification
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, Section G
|
13/08/2021
|
|
Mod_12_21
|
Clarification of text regarding the Effective Date of a Modification
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
13/08/2021
|
|
Mod_11_21
|
Generator, Supplier and Renewable Seat
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 12, Section B
|
13/08/2021
|
|
Mod_10_21
|
Temporary Flexible Seat
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section H
|
16/06/2021
|
|
Mod_09_21
|
Housekeeping 2021
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix C, T&SC Glossary
|
13/08/2021
|
|
Mod_08_21
|
Mod_08_21 Removing the 10MW limit for some Demand Sites to enable Demand Sites that include, or are, an individual Battery Storage Unit > 10MW to participate as part of a Demand Side Unit (DSU)
|
Withdrawn
|
Closed
|
Section B
|
|
|
Mod_07_21
|
Dispatchable Demand Generator Unit 2021
|
Withdrawn
|
Closed
|
Section E, T&SC Appendix A
|
|
|
Mod_06_21
|
Proposing Invoice Improvements to reduce burden on Market Participants
|
Withdrawn
|
Closed
|
Section G
|
|
|
Mod_05_21
|
Collateral exposure of Autoproducer and DSU
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter G, T&SC Chapter H, Agreed Procedure 9
|
12/03/2021
|
|
Mod_04_21
|
Expansion of System Service Flag to include Cross-Zonal Actions for System Security reasons
|
Withdrawn
|
Closed
|
T&SC Appendix B
|
|
|
Mod_03_21
|
Splitting CEADSU variable
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B, T&SC Chapter C
|
16/06/2021
|
|
Mod_02_21
|
Setting a flag for Interconnector Actions above 500/Mwh
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Appendix N, Section F
|
26/01/2022
|
|
Mod_01_21
|
Removal of Difference Charges where operational constraints are binding
|
RA Decision: Recommended for Rejection
|
Closed
|
T&SC Appendix B
|
13/08/2021
|
|
Mod_13_20
|
Transparency of DRB decisions
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
12/03/2021
|
|
Mod_12_20
|
Amendments to DRB Process
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B
|
12/03/2021
|
|
Mod_11_20
|
Definition of a Supplier Member
|
Withdrawn
|
Closed
|
Section B
|
|
|
Mod_10_20
|
Rescind CCIN via email when indicative settlement is delayed and settlement team can verify meter volumes
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 9, Section G
|
11/12/2020
|
|
Mod_09_20
|
Number of days for Interest Calculation
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15
|
05/10/2020
|
|
Mod_08_20
|
Imbalance prices to reflect the real-time value of energy
|
RA Direction
|
Active
|
Section B
|
|
|
Mod_07_20
|
Balancing Modifications Committee Composition and constitution definitions
|
Withdrawn
|
Closed
|
Agreed Procedure 12, Section B
|
|
|
Mod_06_20
|
Removing the requirement for a Monthly Load Forecast
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 6, Section D
|
12/03/2021
|
|
Mod_05_20
|
Provisions for the Settlement of CEADSU
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section H
|
01/10/2020
|
|
Mod_04_20
|
Voting clarification and additional transparency
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 12
|
16/07/2020
|
|
Mod_03_20
|
Temporary Modification to Section B.18.3.2 to introduce an RA approval process for all Suspension Orders
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 18, Section B
|
28/04/2020
|
|
Mod_02_20
|
Housekeeping Feb 2020
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 12, Agreed Procedure 9, Section B, Section F, Section G, Section H, T&SC Glossary
|
26/05/2020
|
|
Mod_01_20
|
PMEA No Energy Action Same Direction as NIV
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section E
|
18/05/2022
|
|
Mod_24_19
|
Amendments to Unsecured Bad Debt and Suspension Provisions Related to Supplier of Last Resort
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, Section G
|
28/02/2020
|
|
Mod_23_19
|
Modification to allow the Market Operator to seek relief from an obligation under Section E.3 of the TSC in exceptional circumstances (until 1 January 2021).
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section B, Section E, Section H
|
07/02/2020
|
|
Mod_22_19
|
Correction of QUNDELOTOL calculations to convert TOLUG and TOLOG to MWh
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
01/07/2021
|
|
Mod_21_19
|
Loss Adjustment Factor Application for Interconnectors
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
08/11/2020
|
|
Mod_20_19
|
Changing Day-ahead Difference Quantity to Day-ahead Trade Quantity in Within-day Difference Charge Calculations
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
01/07/2021
|
|
Mod_19_19
|
Determining use of Complex Commercial Offer Data in Settlement when Required Information is not Available
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
04/11/2020
|
|
Mod_18_19
|
Clarification to apply Recoverable Start Up Costs to DSUs
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F
|
28/02/2020
|
|
Mod_17_19
|
DSU State Aid Compliance Interim Approach
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F, Section H
|
01/10/2020
|
|
Mod_16_19
|
Codification of TSO FNDDS Methodology and System Service Flag for DSU Settlement
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section F, T&SC Glossary
|
28/02/2020
|
|
Mod_15_19
|
Clarification to the description of the role of the Dispute Resolution Board under the TSC
|
Withdrawn
|
Closed
|
Section B
|
|
|
Mod_14_19
|
Interconnector representation on the Modifications Committee
|
RA Decision: Recommended for Rejection
|
Closed
|
Agreed Procedure 12, T&SC Chapter B, T&SC Glossary
|
|
|
Mod_13_19
|
Payment for Energy Consumption in SEM for non-energy Services Dispatch
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
07/12/2022
|
|
Mod_12_19
|
System Service Flag for Demand Site Units
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
13/11/2019
|
|
MOD_11_19
|
Correction to the determination of COP and clarification of CNLR
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
27/09/2019
|
|
MOD_10_19
|
Removal of negative QBOAs related to dispatchable priority dispatch units from the imbalance price
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B
|
29/10/2020
|
|
Mod_09_19
|
Removal of Locational Constraints from Imbalance Pricing Calculation
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Appendix N
|
02/05/2019
|
|
MOD_08_19
|
Clarification to Intraday Quantity and Payment
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
27/09/2019
|
|
MOD_07_19
|
Correction to No Load Cost - "and" vs "or" doc
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
03/05/2019
|
|
MOD_06_19
|
Determination of the Marginal Energy Action Price where no energy is available in the Net Imbalance Volume
|
Withdrawn
|
Closed
|
T&SC Chapter E
|
|
|
MOD_05_19
|
Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F, T&SC Glossary
|
05/07/2019
|
|
MOD_04_19
|
Running indicative settlement on all days
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, Agreed Procedure 16, T&SC Chapter G
|
04/12/2019
|
|
MOD_03_19
|
Amended application of the Market Back Up Price if an Imbalance Price(s) fails to circulate
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter E
|
30/06/2021
|
|
MOD_02_19
|
Removal of difference charges for generators during non RO event periods
|
RA Decision: Recommended for Rejection
|
Closed
|
T&SC Chapter F
|
|
|
MOD_01_19
|
Negative Interest Rates in SEM
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 17, T&SC Section 6
|
02/05/2019
|
|
MOD_18_17
|
Net Inter Jurisdictional Flow Submission
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 1, Agreed Procedure 16, T&SC Appendix L, T&SC Glossary
|
27/09/2018
|
|
MOD_17_17
|
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter G
|
20/04/2018
|
|
MOD_16_17
|
Funding in relation to EirGrid/SONI payment obligations
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Section 1
|
20/04/2018
|
|
MOD_15_17
|
Credit Treatment for Adjusted Participants
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 2, T&SC Chapter G, T&SC Glossary
|
29/03/2018
|
|
MOD_14_17
|
Part B Suspension When Suspended Under Part A
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B
|
29/03/2018
|
|
MOD_13_17
|
Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 9, T&SC Chapter B, T&SC Chapter F, T&SC Chapter G, T&SC Chapter H, T&SC Glossary
|
27/08/2018
|
|
MOD_12_17
|
Outage Adjusted Wind and Solar Forecast Reports
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 6, T&SC Appendix E
|
27/08/2018
|
|
MOD_11_17
|
Deferral of Information Imbalance Charges
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix G, T&SC Chapter H, T&SC Glossary
|
09/02/2018
|
|
MOD_10_17
|
Ex-Ante Quantities Deferral
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix F, T&SC Appendix H
|
26/02/2018
|
|
MOD_09_17
|
Solar in I-SEM
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 4, Agreed Procedure 6, T&SC Appendix E, T&SC Appendix K, T&SC Appendix O, T&SC Chapter B, T&SC Chapter C, T&SC Chapter D, T&SC Glossary
|
06/02/2018
|
|
MOD_08_17
|
Decremental Price Quantity Pair Submission
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter D
|
06/02/2018
|
|
MOD_07_17
|
Credit Assessment Volume for Generator Units
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter G, T&SC Glossary
|
06/02/2018
|
|
MOD_06_17
|
Transitional Credit Cover Provisions
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Section 11, T&SC Glossary
|
26/02/2018
|
|
MOD_05_17
|
Amendment to the Part B Form of Authority for the purpose of removing the Restricted Authority provision
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Section 1
|
24/10/2017
|
|
MOD_04_17
|
Solar in the SEM
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Definitions, Agreed Procedure 4, Agreed Procedure 6, T&SC Appendix E, T&SC Appendix K, T&SC Appendix M, T&SC Appendix O, T&SC Glossary, T&SC Section 2, T&SC Section 3, T&SC Section 4, T&SC Section 5
|
24/10/2017
|
|
MOD_03_17
|
Treatment of Transmission Losses for Trading Sites with Contiguous Autoproducers in I-SEM
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
19/10/2017
|
|
MOD_02_17
|
Unsecured Bad Energy Debt & Unsecured Bad Capacity Debt Timelines
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, T&SC Section 6
|
27/09/2018
|
|
Mod_38_18
|
Limitation of Capacity Market Difference Payments to Metered Demand
|
RA Decision: Recommended for Rejection
|
Closed
|
T&SC Chapter F
|
|
|
Mod_37_18
|
Housekeeping Between V20 and V21
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix F, T&SC Appendix G, T&SC Glossary
|
04/03/2019
|
|
Mod_36_18
|
Settlement Document and Invoice Terminology Clarifications
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, T&SC Appendix G, T&SC Glossary
|
15/03/2019
|
|
MOD_35_18
|
Clarifications to Dispute Process
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B, T&SC Chapter E
|
05/03/2019
|
|
Mod_34_18
|
Removal of MWPs for biased quantities and negative imbalance revenue and clarifications to determination of Start Up Costs Final
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
27/01/2019
|
|
Mod_33_18
|
Update to Unit Under Test Process
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter D, Agreed Procedure 4, T&SC Appendix F, T&SC Glossary
|
02/07/2019
|
|
MOD_32_18
|
Removal of exposure for “in merit” generator units against BOA
|
Withdrawn
|
Closed
|
Appendix N
|
|
|
MOD_31_18
|
Imbalance Pricing During Outages of the Imbalance Pricing System
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix E
|
27/09/2018
|
|
MOD_30_18
|
Market Back Up Price Amendment
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix B
|
27/09/2018
|
|
MOD_29_18
|
Part B Schedule Production Cost Definition
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
27/09/2018
|
|
MOD_28_18
|
Ordering of Pseudo Dispatch Instructions for QBOA with the same Instruction Issue Time and Instruction Effective Time
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix O
|
27/09/2018
|
|
MOD_27_18
|
Interim arrangements in Appendix O for Instruction Profiling and Bid Offer Acceptance Quantity Outcomes in a Subset of Undo Scenarios
|
RA Decision: Recommended for Rejection
|
Closed
|
T&SC Chapter H
|
|
|
MOD_26_18
|
Market Back Up Price Reference Corrections
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B, T&SC Chapter E, T&SC Chapter G
|
27/09/2018
|
|
MOD_25_18
|
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Timelines and Correction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, T&SC Glossary
|
04/03/2019
|
|
MOD_24_18
|
Use of Technical Offer Data in Instruction Profiling / QBOA
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix O
|
27/09/2018
|
|
MOD_23_18
|
Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15
|
27/09/2018
|
|
MOD_22_18
|
Part B Credit Cover Signage & Subscript Correction
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Glossary
|
27/09/2018
|
|
MOD_21_18
|
Application of Settlement Reallocation Agreements to Market Operator Charges & Settlement Document Definition & Usage
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 1, Agreed Procedure 10, Agreed Procedure 15, Agreed Procedure 17, T&SC Appendix G, T&SC Glossary
|
27/09/2018
|
|
MOD_20_18
|
Agreed Procedure Updates
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 1, Agreed Procedure 15, Agreed Procedure 17, Agreed Procedure 4
|
27/09/2018
|
|
MOD_19_18
|
Part B Housekeeping 1
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix E, T&SC Appendix H, T&SC Appendix I, T&SC Glossary
|
27/09/2018
|
|
MOD_18_18
|
Transitional Regulatory Reporting
|
Withdrawn
|
Closed
|
T&SC Appendix C
|
|
|
MOD_17_18
|
Transitional Provisions for Cutover
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
27/09/2018
|
|
MOD_16_18
|
Interim Suspension Delay Periods
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter B, T&SC Chapter H, T&SC Glossary
|
27/08/2018
|
|
MOD_15_18
|
Clarifications for Instruction Profiling
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Appendix O
|
27/08/2018
|
|
MOD_14_18
|
Change to Timing of Publication of Trading Day Exchange Rate
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 6, T&SC Chapter G
|
27/08/2018
|
|
MOD_13_18
|
Calculating Obligated Capacity Quantities for Units Not Yet Commissioned
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F
|
27/08/2018
|
|
MOD_12_18
|
Modification to Part B Agreed Procedure 17
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 17
|
27/09/2018
|
|
MOD_11_18
|
Correction of Minor Material Drafting Errors
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter F, T&SC Chapter G
|
20/06/2018
|
|
MOD_10_18
|
Amendment to Capacity Settlement Publication from Monthly to Daily
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 15, T&SC Chapter G
|
20/06/2018
|
|
MOD_09_18
|
Interim Credit Treatment for Participants with Trading Site Supply Units
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter H, T&SC Glossary
|
27/08/2018
|
|
MOD_08_18
|
Clarification of Rules Used to Determine the Value of Price Average Reference Tag (TPAR)
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
21/06/2018
|
|
MOD_07_18
|
Clarifications of Use of Variable “B” in NIV and PAR Tagging Scenarios
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
27/08/2018
|
|
MOD_06_18
|
Clarification of Marginal Energy Action Price Calculation Including Scenario When All Actions Are Flagged
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter E
|
21/06/2018
|
|
MOD_05_18
|
Clarification of Administered Scarcity Pricing Function for Scenarios Not Yet Covered in Rules
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
T&SC Chapter E
|
20/06/2018
|
|
MOD_04_18
|
Reporting and Publication for Operational Schedules, Dispatch Instructions, Forecast Availability and SO Trades
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 6, T&SC Appendix E
|
20/06/2018
|
|
MOD_03_18
|
Autoproducer Credit Cover
|
RA Decision: Recommended for Rejection
|
Closed
|
T&SC Chapter G
|
|
|
MOD_02_18
|
Meter Data Publication Timing
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
Agreed Procedure 6
|
27/09/2018
|
|
MOD_01_18
|
Notification of Suspension to SEM NEMOs
|
RA Decision: Approved (Not Vetoed)
|
Closed
|
|
05/04/2018
|
|